CURRICULLUM VITAE
HAIRUDIN MANOLE
CONTACT INFO
Adress : Perum Fortuna Raya Blok JJ No. 21 Batu Aji Batam, Kepulauan Riau,
Indonesia.
Home town : Luwuk Banggai Sulawesi Tengah.
Mobile : 081277421730, 085265418001,
PERSONAL PARTICULARS
Age : 33 years
Nationaly : Indonesia
Marital Status : Marriage
Permanent Residence : Batam Kepulauan Riau
EDUCATION BACKGROUND
Highest Education
Level : Bachelor’s Degree
Field of study : Sarjana Administration
Major : Administration State Science
Institute : Tadulako University
Located In : Palu – Indonesia Graduate Date : 2005
CERTIFICATION COURSE
1. Welding Inspector of BNSP Indonesia (Indonesian Professional Certification Authority)
Specification : 1. Inspection Welding of Ship Building & Contruction
2. Inspection Welding of Pipe Line
3. Inspection Steel Contruction Tubular & Non tubular
4. Inspection Oil Tank
5. Metal Joining & Cutting process
6. Welding joint geometry & welding symbol
7. Dokumen governing welding inspection & qualification
8. Metal profertis & destructive testing
9. Metric practice for welding inspection
10. Welding metallurgy for welding inspection
11. Weld & base metal discontinuities
12. Visual inspection & other NDE methods & symbols
13. Verification welding procedure specification (WPS)
14. Verification & testing welding operator
Institute : Badan Nasional Sertifikasi Profesi
Autority Certified : Lembaga Sertifikasi Profesi Las
Certificated Number : 00289 0721 0000211 2010
2. Welding Inspector of Universal Institute for NDT & Welding Inspection
Specification : 1. Inspection Welding of Ship Building & Contruction
2. Inspection Welding of Pipe Line
3. Inspection Steel Contruction Tubular & Non tubular
4. Inspection Oil Tank
Institute : PT. UNIVERSAL POWER VISION BATAM
Authority Certified : Head Departemen of Manpower - Batam Municifal
Certificated Number : AWS – WI – 094F – B.Aji - 09
3. Welder Test
Specification : Welder 3G SMAW
Institute : PT. BATAMEC WELDING SCHOOL
Company Subcon : PT. Aulia Arrahman
Stamp Number : W-0298
4. Safety Induction
Specification : Safety & Health of Working Area Ship Building
Institute : PT. PALINDO MARINE SHIPYARD – BATAM
Certification Number : 013/CSI/PM-BTM/I/2010
5. Computer Word & Exel Course
Specification : Computer Word & Exel
Institute : Lembaga pendidikan dan Keterampilan “ Mulia Darma Utama” Palu.
Certification Number : 293/MDU-MS/03
EMPLOYMENT HISTORY
1. | Company Name | : | PT. PALINDO MARINE SHIPYARD – BATAM |
| Position Title | : | QA/QC (Welding Inspection) |
| Position Level | : | Senior Staff |
| Specialization | : | Supervisor Welding Inspector |
| Industry | : | Shipyard |
| Date Joined | : | 4 January 2010 Date Left : 20 August 2011 |
| Work Description | : | 1. Ferry Pacific of Singapore 2 unit (BV Class) 2. Drilling Ponton of Australia (BV Class) 3. Lington of Australia (DNV Class) 4. Kapal Cepat Rudal Nasional Baja TNI – AL 3 unit (BKI Class) 5. Patrol Boat of Sangata FRP 6. Dumai Line 1 & 2 Aluminium (BKI Class) 7. PC-48 Bakorkamla Baja (BKI Class) 8. Patrol Boat SAR Sumatera Barat (FRP) 9.MV. Superjet 19 Aluminium (BKI Class) |
| Job Scope | : | 1. Prepare for material tracing ability as per material order. 2. Organize welder/procedure qualification test under the surveillance of class surveyor. 3. Prepare for fit-up & aligment report before & after welding. 4. Prepare the visual welding inspection report. 5. Prepare air test, hidro test, vacuum tes & NDT test. 6. Prepare Welder test. 7. Prepare & plan for the classification (surveyor) & Owner rep. for inspection. |
2. | Company Name | : | PT. DRYDOCKS WORLD NANINDAH MUTIARA SHIPYARD - BATAM |
| Position Title | : | QA/QC (Welding Inspector) |
| Position Level | : | Senior Staft |
| Specialization | : | Welding Inspector |
| Indistry | : | Shipyard & Oil Gas |
| Date Joined | : | 5 Januari 2009 to up 31 December 2009 |
| Work Description | : | JACK – UP DRILLING RIG – PERRO NEGRO 6 |
| Job Scope | : | 1. Prepare for material tracing ability as per material order. 2. Organize welder/procedure qualification test under the surveillance of class surveyor. 3. Prepare for fit-up & aligment report before & after welding. 4. Prepare the visual welding inspection report. 5. Prepare air test, hidro test, vacuum tes & NDT test. 6. Prepare Welder test. 7. Prepare & plan for the classification (surveyor) & Owner rep. for inspection. |
3. | Company Name | : | PT. AULIA ARRAHMAN Sub Contractor Under PT. BATAMEC – Batam |
| Position Title | : | QA/QC (Welding Inspector) |
| Position Level | : | Assistan QC |
| Specialization | : | Chekker Final Fit-up, Welding & Welder Certification |
| Industry | : | Shipyard |
| Date Joined | : | June, 07 th 2008 Date Left : Des, 31 th 2008 |
| Work Deskription | : | 1. Tugboat from norwegia 2. Oil Barge from Singapore |
| Job Scope | : | 1. Prepare for material tracing ability as per material order. 2. Prepare for fit-up & aligment report before & after welding. 3. Prepare the visual welding inspection report. 4. Prepare air test, hidro test, vacuum tes & NDT test. 5. Prepare Welder test. 6. Prepare & plan for the classification (surveyor) & Owner rep. for inspection. |
4. | Company Name | : | PT. POLESTAR PLASTICS BATAM |
| Position Title | : | Inventory |
| Position Level | : | Senior Staft |
| Specialization | : | Inventory Material |
| Industry | : | Manufacture |
| Date joined | : | 02 Nopember 2006 up to December 2007 |
| Job Scope | : | Order & Cheker material, send material, Production material, & report material. |
5. | Company name | : | PT. BUKAKA KUJANG PRIMA |
| Position Title | : | Officer |
| Position Level | : | Senior Staft |
| Specialization | : | Material Handle |
| Industry | : | Oil & Gas |
| Date joined | : | 27 December 2005 up to October 2006 |
| Work Description | : | Ombilin Steam Power Plant (2 x 100 MW) |
| Job Scope | : | Order & Cheker material, send material, Production material, & report material. |
6. | Company Name | : | PT. JAYA ASIATIC SHIPYARD |
| Position Title | : | Logistic Departement |
| Position Level | : | Senoir Staft |
| Specialization | : | Material handle |
| Industry | : | Shipyard |
| Date joined | : | 10 Agustus 2005 up to 09 November 2005 |
| Job Scope | : | Order & Cheker material, send material, Production material, & report material. |
Batam, September 2011
Sincerely,
HAIRUDIN MANOLE
Tidak ada komentar:
Posting Komentar